@

@
Quality System
@ Checking procedures and flows
Our checking system is divided into 6 sections:

Incoming
No. of inspector 3

Job descriptions:
To check all incoming raw material quality match the requirement on purchasing order or customer specification.  Issue the  qualified raw material to production floor.

Purpose:
To avoid any unqualified raw material going to production floor, and the products being rejected because of this raw material.
@
@

| Home | About Us | Mission | Business | Products | Power | Factories | Inquiry | Contact Us |
Copyright 2005 © Cherry Plastic Ltd. All rights reserved. Design & Hosted by HKWWW @